Nineteen enthusiastic students from the UW’s Introduction to Environmental Science class participated in our October 6th forest restoration work party. Our staff consisted of two GreenFriends members and a volunteer who had helped at the September 30th work party.
As always, the work party began with an orientation. Afterwards, we formed a bucket brigade to spread wood chips along the paths throughout our Greenbelt site. Last year, the paths got muddy and slippery during the winter rains. We hope by covering them with a thick layer of wood chips, we will prevent that from happening again.
The first photo below shows what the wood chip pile looked like at the beginning of this work party. The second shows its size at the end of the event. It is even flatter than it looks! There is no doubt in my mind that the pile will be gone by the end of our next work party.
(Click on the galleries to enlarge the photos.)
For the second week in a row, I got so immersed in the work that I forgot to take photos of the bucket brigade. But I can show you the results of our work!
Halfway through the work party, we took a 15 minute snack break and then divided into three work groups.
Work group 1
Last year, when we cleared the land in the southern part of our site, we piled the blackberry vines and blackberry root balls that we removed on nearby drying racks. We ended up with four large piles of debris that is taking up room that could better be used for planting.
We decided to eliminate the piles by cutting the debris into 3-8 inch pieces and then spreading it on the paths that we will be covering with wood chips during our next work party.
I had spent a considerable amount of time cutting up the debris in one of these piles prior to this work party. I don’t have a photo of what the pile looked like when I started, but the photos below will give you an idea of what it was like when this group started working on it and what it looked like at the end of the work party. The size of the pile has decreased at least 50% since the beginning of October. I hope we can finish that task soon.
For now we are placing the branches that are too thick to cut up at one end of the pile. We will decide what to do with those later.
Work group 2
The second group worked on a compost pile that had been created on the site many years before this forest restoration project began. Volunteers in the last work party had started removing trash and branches from the pile. The photos below show this area before and after the September 30th work party.
On October 6th, two of the students dug out a plastic garbage can that was buried near the compost pile and then began to remove bluebell bulbs that had been multiplying in the pile for years. They also separated more trash and branches from the rich soil.
While the two students were working on those tasks, three others removed big branches and tree stumps that were scattered around an area where we will be planting trees, shrubs and ground covers in November. Once the big items were moved to a different part of the site, the students raked a pile of dried bamboo branches away from that area as well.
When they finished those tasks, the students joined the two who were working on the compost pile. They sorted the branches that had been removed from the pile of dirt. The small branches and dried blackberry canes were cut up so that we can spread them on the paths; the bigger branches were stacked. The photos below show what the area looked like at the end of this work party.
Work group 3
The third group dug up blackberry shoots and blackberry root balls from the area where we will be creating paths next weekend.
At one point, I started hearing shouts of celebration coming from that direction. I wondered if the students had dug out some huge root balls. That is always cause for excitement. When the sounds continued, I got curious. Eventually, I walked to that part of the property and asked the staff member what was happening.
I learned that some of the students were having a competition to see who could cut down the longest blackberry vine. By then, they were working in an area that we have not cleared before, so they were finding some LONG vines! Some of the cut vines were put on a small drying rack while others were taken to an area we call The Rack Zone. (The Rack Zone is located in the foundation of a house that burned in the 50’s. It is filled with large piles of dried or drying blackberry vines, blackberry root balls, ivy and bindweed.)
Look at the length of the vine in the last photo. I don’t know who won the competition, but that vine was certainly a contender. (Remember, you can click on the gallery to enlarge the photos.)
All of the debris that had been cut up by the first and second work groups was spread on the areas where we will be constructing paths next weekend. The photos below show what those future paths look like now. (The paths will be 3 feet wide except in the occasional places where several paths merge.) The last photo is of the section where I believe the students found the long vines.
Fifteen minutes before the work party ended, we began to clean and put away the tools and supplies. As they finished that work, the volunteers began to gather for the closing. These photos were taken while we waited for the last few students to join us. Once everyone was present, we celebrated all that we had accomplished during the three-hour work party.
Afterwards, everyone brushed their shoes to remove any remnants of invasive plants that might be spread to other properties, said goodbye and went on their individual ways. Several participants told me they hoped to attend one of our next work parties!
So very cool, keep up the great work, hope to see it in peronsometime!
LikeLike