
During our August 10 work party, two team leaders, seven students from the UW’s Introduction to Environmental Science class, a mother and daughter from our neighborhood and a volunteer who found us on Green Seattle Partnership Event Page participated. Three of the students had also attended our August 3 event. The August 10 work party was unusual in that most of the volunteers had previous restoration experience.
In the days preceding the event, the weather forecast changed several times a day, so we had no idea what to expect. When I started setting up that morning it was raining, but the rain had stopped by the time the work party began. And by the end of the work party, it was sunny. It has been quite hot lately but on this day the temperature was in the 60’s. Mother Nature had blessed us with a perfect work day.
I had ordered eight cubic yards of wood chips to be delivered sometime after August 12, so wanted to use up as many of the wood chips in the wood chip pile that is located on 25th Ave S as possible. During the August 10 work party, we would begin to make smaller piles of wood chips inside the Greenbelt. The wood chips in those small piles will be used when we do the fall planting. (When we plant trees, shrubs and ground covers, we place a four inch thick ring of wood chips around each new plant to help with weed reduction and water retention.) During the August 10 work party, we would also reinforce the upper path on our site by placing a new layer of wood chips over the existing path.
Since we didn’t have a big group of volunteers, we didn’t create the type of bucket brigade we had used on August 3. Instead, each volunteer carried many buckets of wood chips, two at a time, and dumped them in the appropriate places. I didn’t take any photos of this segment of the work party; I was too busy filling buckets. I did take some photos of the results of the work at the end of the event.
The first photo below shows what the pile looked like on July 7, the last time we had used wood chips from that pile. The second photo shows what the “pile” looked like after this segment of the August 10 work party. There are still wood chips in the pile, but even though the picture doesn’t show it clearly, the pile is nearly flat. The space is ready for the new delivery of wood chips!
July 8 work party end of August 10 work party
We had made three smaller wood chip piles inside the Greenbelt and covered about 250 feet of path with new wood chips.
new wood chip pile new layer of wood chips on path
After a break, the group split into two teams. One team focused on removing the bindweed, and suckers that were shooting up from stumps of maple trees, in areas that border the Hanford Stairs. The maple trees had been cut down at some time in the past because they were under power lines.
Click on any of the photo galleries to see an enlarged version of the photos.
Maple suckers
It was difficult to get before and after photos of the areas where the bindweed was removed because there is a dense cover of braken ferns and horsetails. I decided the best way to show the results of the work these students did was through a photo of the three bags of bindweed that they removed during this 45 minute work session! (To give you a sense of the size of the bags, know that they each one once held 40 pounds of pellets for a pellet stove heater.)

I did take before and after photos of the two places where the maple leaf suckers were removed.
Before After Before After
The second team removed blackberry shoots and weeds from an area on the southeastern section of the site. They were even able to remove blackberry vines from under the big elderberry plants. Some of the elderberry plants are now 12-16 feet tall.
They also dug out a tire, a gas can and a pot. Here are photos of the gas can and the tire!
Before After
I saw the first berries on our elderberry plants during this work party. They were from a red elderberry. We have planted red, blue and black elderberry shrubs. I wonder if any of the others will fruit this year.

During the work session big blackberry vines and little ones were removed. This is a photo of one area before we started the work.
Before
And the next set of photos show what some of the areas that this team worked on looked like at the end of the work party.
After
You can even see the ground under this elderberry plant!

I find myself using the word “amazing” a lot when I describe our work parties. That is an accurate description of this work party as well. I think it is amazing that twelve volunteers were able to accomplish so much during a three-hour work party.
***
I feel so grateful for all of the volunteers who participated in this work party as well as for those who have worked here in the past or will work here in the future. Every volunteer leaves having made a significant contribution in creating “Another Future Healthy Forest”.

Wonderful
LikeLiked by 1 person
Love to all of you.
LikeLiked by 1 person