Greenbelt Restoration Work Party: July 25, 2018- Practice in Flexibility, Persistence, Letting Go and More

Preparing for and leading the July 25 work party was a perfect opportunity to practice flexibility, letting go, non-attachment, staying in the moment, equanimity, persistence and a host of other values that I haven’t yet identified. At times, the challenges seemed endless.

Perhaps the first challenge occurred two weeks before the event when I fell while working in the Greenbelt. I found myself dealing with bruised ribs… again. I’ve done my best to stay conscious of my feet while walking on the sloped, uneven land but clearly I wasn’t staying conscious enough. As the work party approached, I purchased a walking stick, something I’d considered doing for a long time, and bought a good pair of hiking shoes. I also threw away the very old tennis shoes that I had been wearing the day I fell. I had known they didn’t give my feet enough support but they were so comfortable and easy to slip on. It felt good to take care of myself by discarding them.

Based on past experience, I expected we would have around 15 students from the UW Introduction to Environmental Science class. I felt very grateful when two of our regular volunteers agreed to be team leaders. Then, I was told that someone I had met in the past had moved to Washington. I discovered that he has lots of experience doing this kind of work. When I told him about the event, he was very interested in helping. So, counting me, we had four staff. Hooray!

That changed when one team leader got sick and it became obvious he wasn’t going to be able to come and another let me know she couldn’t participate. Then the third had a conflict and would only be able to come for part of the time. That left me as the only leader that would be present the whole time.

The day before the work party, we only had two students registered. Another registered that evening. I was surprised that we were going to have such a small work party, but with such a limited number of staff I knew it was for the better. Besides it is fun to have a tiny group from time to time.

Another challenge that we would have to deal with was hot weather. I’m used to having work parties planned out in great detail. When I discovered it would be in the high 80’s or low 90’s that day, I realized I would have to be prepared to let go of my “plans” and instead to practice flexibility and letting go. We would have to work wherever there was shade as it would be too hot to work in the sun. (Most of the work I had planned would have been in direct sunlight.)

Since this work party would be from 1 to 4 pm, I waited until the morning of the event to buy food for snack time. When I got into my car, I used the handle to shut the door and it broke off. I went back in the house to ponder the situation. When I returned to the car, I discovered that in addition to the broken handle, the driver’s door was locked and wouldn’t open. Because of my injured ribs, I couldn’t move into the driver’s seat from the back seat or from the passenger seat. I couldn’t believe it. I decided snack time would have to consist of what I already had in the house, uninteresting as it might be.

Several hours before the beginning of the work party, I set out directional signs on 25th Avenue South, on the Hanford Stairs and on Cheasty Boulevard. As I walked down the stairs going towards Cheasty, I noticed there was a police car parked nearby. And to the north of it, there was yellow tape blocking the road.

Since that was the way the students who took the light rail would be arriving, I walked down the stairs to get a closer look. Once there, I learned that a big tree had fallen during the night and it had knocked down power lines. I told the policewoman that people would be coming to a work party in a few hours and would be walking along that road. She told me that the repair work would take most of the day but assured me that the students would be allowed to walk through. I was still concerned. What if the students saw the tape stretched across the road and didn’t know what to do. Would they turn around and go home? I walked back to my house and sent out notices by voicemail and email.

Shortly before the work party was to begin, I walked towards the stairs again. I could hear, and soon could see, that there were  students sitting on the stairs. I thought they might be the UW students I was expecting. As I got closer to them, I could see that they were smoking. When they saw me, they ran away. I realized they were not here for the work party and that they were probably students from a nearby high school who were on their lunch break . They probably ran away because they were caught smoking, but I also laughed to myself when I thought how weird it must have seemed to have an older woman who was wearing a sun hat and an orange safety vest and holding a long walking stick come out of the forest.

Finally, it was almost time for the work party to begin. One of the  students came early, so he helped me bring the rest of the supplies into the site. Then the other team leader and the rest of the students arrived… and then a surprise… a fourth person, who had seen the work party on an event calendar joined us. I had wondered if there would be participants who would decide not to come because of the heat. Not only did everyone who had signed up show up but we had an additional person!

We started working in areas that had already been planted, removing wood chips that were touching the stems of the plants as well as digging out invasive blackberries, ivy and bindweed that was sprouting. (We put wood chips throughout the planting areas to hold in moisture and reduce weed growth. The wood chips are not supposed to touch the plant however, so we attempt to keep the space around the plant cleaned out. We refer to that empty space as a “donut hole”. ) As we finished one area, we moved to another, following the shade as much as possible. Every planting area looked so much better after we finished taking out the invasive blackberries and bindweed, and cleaning out the donut holes.

I didn’t remember to take photos during the first part of the work party, but this is what some of the planting areas looked like after we worked on them.

 

And these photos were taken later.

 

After the break, we all moved to the Greenbelt site that is north of our main site. We started by moving a drying rack that had accidentally been constructed in the place where future wood chip piles would go. I was amazed to see that the blackberry canes and other invasive plant cuttings that had been placed on it were already dry. We used that dried debris in constructing the new rack.

[Note: We place the blackberry canes, blackberry root balls, ivy and bindweed on drying racks so that they don’t touch the ground and re-root. The increased airflow that results from having them off of the ground also speeds up the drying process.]

We will be removing a lot more blackberry vines and root balls from this area. It is good to have a new rack ready to receive them.

There was a truck parked in the area I had planned to clear next, but the sun was also there, so we moved further  into the Greenbelt instead. It was still hot there, but there was a lot of shade, and a slight breeze.

We cleared an area of blackberries so that we could build another rack there. Once that rack was complete, the students continued digging out blackberries. We also started pulling out ivy. All of the cuttings were placed on the new rack.

 

Ten to fifteen years ago, many evergreen trees were planted in this part of the Greenbelt. I have been very eager to start freeing them from the invasive vines that had grown over them since then. We began working on one of those trees at this work party. There is much more to do before the tree is fully free, but we made considerable progress. (If you click the gallery to enlarge the photos…. and look closely…. you may be able to see that there is less ivy under and going up the tree!)

 

Even though the area was shady, we were all tired from working in the heat so stopped a bit sooner than we would have under normal conditions. After putting the tools and other supplies away, we gathered on the stairs to celebrate our achievements and to take a group photo.

Once again, we had accomplished so much in a short period of time. It was another big step in returning this land to the healthy forest it once was.

Not only did I enjoy leading another work party, but I had also survived a myriad of challenges and had had an abundance of opportunity to practice flexibility, letting go, non-attachment, staying in the moment, equanimity, persistence and more. While I know that these experiences will help me grow, I hope the frequency of the challenges will slow down for a while!

3 thoughts on “Greenbelt Restoration Work Party: July 25, 2018- Practice in Flexibility, Persistence, Letting Go and More

I would love to hear from you!

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s